«EIDE LIFT 2» loading Reels for Rockwater Troll C Project

By Kjartan Mehammer,

06.07.2000 –



«During week 23 «EIDE LIFT 2» will start loading Flexipipe Reels to «TOISA PERSEUS» for the Troll C Project. The loading periode is 15.06.00 – 15.07.00

Our contract partner is AS Stordbase (Nor Sea).



Email this story to a friend:
To:
From:


More articles Archive   Search the news




Subscribe?

 

 





Barge Invest AS
Hillestad
N-5457 Høylandsbygd
Norway
Tel: (+47) 53 48 35 50 – Fax: (+47) 53 47 72 41
E- mail: eide@eide-gruppen.no