«EIDE LIFT 2» loading Reels for Rockwater Troll C Project «During week 23 «EIDE LIFT 2» will start loading Flexipipe Reels to «TOISA PERSEUS» for the Troll C Project. The loading periode is 15.06.00 – 15.07.00
Our contract partner is AS Stordbase (Nor Sea).
|
|
Barge Invest AS Hillestad N-5457 Høylandsbygd Norway Tel: (+47) 53 48 35 50 – Fax: (+47) 53 47 72 41 E- mail: eide@eide-gruppen.no |