Flash problems? Download last Flash Player !
Rødsand Offshore Wind Park | |
Transport from Poland with tug and barges. | |
Date: 2010-07-14 08:52:21 – Added by: admin | |
Views: 9824 – : 0 – : 0 | |
Salvage of Rocknes | |
Salvage of the capsized rock dumping vessel Rocknes | |
Date: 2010-07-14 08:26:42 – Added by: admin | |
Views: 11652 – : 0 – : 0 | |
Hiload | |
Launching of ”HILOAD DP 1” by submersing the barge to 17 meter water on deck. Then cargo performed differnet seatrials before docking onto ”EIDE BARGE 33” again. Loading from quayside to barge by roll on / launching by float off / docking from sea to barge by float on. | |
Date: 2010-06-03 19:36:09 – Added by: admin | |
Views: 13219 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of submarine from Stockholm to San Diego by heavylift vessel ”EIDE TRANSPORTER”. The work include float in / float out operation, cribbing and seafastening design / work. | |
Date: 2010-06-03 19:35:39 – Added by: admin | |
Views: 7003 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of offshore modules for Statoil Volve project. The work include design, engineering and production work related to grillage & seafastening and the transportation. Loading / unloading was performed by roll on / roll off over the vessel stern. | |
Date: 2010-06-03 19:34:15 – Added by: admin | |
Views: 5702 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of submarine from Stockholm to San Diego by heavylift vessel ”EIDE TRANSPORTER”. The work include float in / float out operation, cribbing and seafastening design / work. | |
Date: 2010-06-03 19:33:42 – Added by: admin | |
Views: 7689 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of two patrol boats in one go on Eide Transporter. The work include design, engineering and production work related to grillage & fastening, laoding / unloading by float on / float off and the transportation. | |
Date: 2010-06-03 19:30:37 – Added by: admin | |
Views: 10716 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of offshore modules for Statoil Volve project. The work include design, engineering and production work related to grillage & seafastening and the transportation. Loading / unloading was performed by roll on / roll off over the vessel stern. | |
Date: 2010-06-03 19:29:19 – Added by: admin | |
Views: 8926 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of Canadian submarine ”HMCS Chicoutimi” from Scotland to Halifax by heavylift vessel ”EIDE TRANSPORTER”. The work include float in / float out operation, cribbing and seafastening design / work. | |
Date: 2010-06-03 19:28:29 – Added by: admin | |
Views: 5735 – : 0 – : 0 | |
MV ”EIDE TRANSPORTER” | |
Transportation of Canadian submarine ”HMCS Chicoutimi” from Scotland to Halifax by heavylift vessel ”EIDE TRANSPORTER”. The work include float in / float out operation, cribbing and seafastening design / work. | |
Date: 2010-06-03 19:24:58 – Added by: admin | |
Views: 5542 – : 0 – : 0 | |
[ 1 ] – [ 2 ]